(Confidential Client) Internet Data Center - Dallas, TX
This web-hosting facility was constructed in 3 phases over a 5-month period. Phase 1, completed in 8 weeks, consisted of installing the complete administrative areas,
18,000 SF of raised access floor and the complete MEP system. The construction
was phased to allow the client to occupy the facility and to lease collocation space
while the other 2 phases were under construction.
Features include:
- 142,000 SF facility with 116,000 SF of raised access flooring
- 5 - 400 ton chillers (expandable to 8)
- 123 - 20 ton down flow computer room air conditioning (CRAC) units
- 4 - 1500 KVA parallel redundant UPS systems (expandable to 6)
- 4 - 2000 KW emergency generators (expandable to 6)
- 4 - 3000 amp electrical service
- 2 fiber optic (diverse) entrances
- 60 - 125 KVA dual-input power distribution units (PDU) with static transfer switch
|